HOW To lag copper pipes like a pro!
563,192
Published 2024-02-03
I’m using a tool made from a guy in the uk at drpipe.co.uk/product/tube-lagger-pro/
The tool allows me to be fast and efficient with next to 0 wastage as the cuts are made perfect first time.
To get the cuts as perfect as I could I’m using an insulation knife from toughbuilt. This comes in a holster so I can keep the blade as sharp as possible.
All Comments (21)
-
Lag the pipes is a saying in my part of the world. Good job there.
-
Quality workmanship as always!
-
Lag?! What the hell is LAG!? Been plumbing 25yrs never heard that term, we actually call it "insulating pipe" where I am.
-
Nice touch👌…. Someone who takes pride in his work for a change!👍
-
At 2:04 I'm confused, and I feel like he reshot some footage. With the insulation in the correct final orientation he marks the FRONT FACE. He cuts out the section he marked. When he fits it, the cut out in on the TOP FACE. Did he make a mistake and reshoot, or am i missing something
-
I used to do plumbing along time ago, and when I first started, we used the pipe bender but then the inspector wasn’t allowing it anymore we had to use fittings, but I really liked using the bender, what country are you in?
-
That’s actually a damn clean install!
-
Very good 👍👍👍👍👍👍👍👍
-
Really loving the channel. Neat job.
-
So that’s the secret, you measure and then cut, who’d have ever thought 🤦♂️
-
Great job loved this
-
I miss the old days using asbestos and muslin. :D
-
Very good👍👍 早速作ろう🤩
-
Or could be like pros that did my boiler move and replacement. Just don't lag any of it, long pipe runs in the loft all naked for all to see.
-
Excellent video. Beautiful work. Such a shame to cover those beautiful pipes!
-
Whoa brilliant 👍🏼👊🏼🏴🇬🇧
-
Please share 3d print model for cutting.
-
Я у себя все это сделал без шаблона. Полные разрезы только когда заканчивался утеплитель. Изгибы, крепления все вырезалось. Сначала да - непонятно как, а потом полетело.
-
4 weeks later after full installation, jobs done love
-
Отлично!