3 plumbing tips you should do in every project š§
601,983
Published 2022-10-04
1.) copper stub outs with blocking
2.) coordinate baseboard height with baseboard
3.) localized shut offs
#plumbing
Full video:
Ā Ā Ā ā¢Ā TheseĀ plumbingĀ detailsĀ willĀ levelĀ upĀ ...Ā Ā
All Comments (21)
-
I've got a bathroom remodel tip: If you haven't rocked yet, and know where towel rods, hooks and tp holder is going to go, put some wood in there. You'll have something to screw to.
-
A-good B-good C-massive overkill for residential.
-
On the stub out above the base boards, remember that an escutcheon plate will also be installed to make the hole through the drywall look nicer; so the height above the base boards needs to also account for the size of that escutcheon plate.
-
These are plumbing tips you get from a carpenter
-
Need more possible leaks, well youāre going to wanna get you a Manifold
-
Love the videos, especially as a maintenance tech in the same area as you. I may be maintaining some of these homes. š¤£
-
Toilet supply, 8ā to the left, 8ā up, works for me every time.
-
Also run the system in a loop rather than branch so you can have āinstantā hot water and also save water.
-
I like the copper stub out. I have seen so many houses with the shut off all floppy coming thru the sheetrock at all angles.
-
Donāt ever put you water line in the baseboard. Talk about screwing the next trade.
-
Manifolds are great but you forgo the benifits of a hot water recirculation loop. I haven't seen a system that uses both yet
-
As a trim guy I appreciate this
-
Remember to spend all your money on the rough plumbing so you canāt afford to buy the toilet.
-
Iām curious how your manifold works if your hot and cold are all hooked together? Are you using an instant hot water in each room?
-
We are three of the best plumbers that ever Plumbed a Plumb
-
Excellent ideas. I only wish the person that plumbed my house had done that.
-
Tip 2 is a seriously overlooked issue ā¦ contractors need to make sure this information is provided š
-
Number 4: Donāt wall over brick.
-
Excellent tips, thank you for those
-
Don't add extra stuff in your house on the hypothetical chance you might remodel in the future it probably won't even be you. Someone wants to remodel 20 years in the future just add a shut off in the basement it'll take all of 20 minutes...