Workshop Build | Almost finished | Ep.10 | Man build his own Workshop
Published 2022-11-20
I weld the lock housing, and assemble the door handle. (I also created the door handle myself but I didn't picture of the preparation, It is an iron pipe and 2 flat irons that are welded together.)
From Foamed polyethylene I make triangles to seal the "waves" of sheet metal.
And with strong glue, I seal and close the large slits.
The massive work is over, But there are still some tasks left to complete the workshop: Electricity, sealing the bottom of the door, arranging the interior space and more....
Ep.1: • Workshop Build | Metal Structure | Ep...
Ep.2: • Workshop Build | Poles installation |...
Ep 3: • Workshop Build | Roof beams installat...
Ep 4: • Workshop Build | Aluminum Windows | E...
Ep 5: • Workshop Build | Install a window fra...
EP 6: • Workshop Build | Install sliding door...
EP 7: • Workshop Build | Sliding door claddin...
EP 8: • Workshop Build | Final preparations b...
EP 9: • Workshop Build | Roof & Wall installi...
Follow up and join me on the journey.
It's going to be interesting!
Subscribe for the channel and follow the upcoming videos: / @kultakala_design_studio
Thanks for watching!
For collaborations contact me: [email protected]
www.facebook.com/kultakaladesign/
www.instagram.com/kultakala_design_studio/ www.instructables.com/member/Omer%20O/instructable… www.pinterest.com/omerorbach/_created/
#workshop
#sheetmetal
#lockhousing